Algoritmi | User | Bruno Samuel Ferreira Gonçalves


Bruno Samuel Ferreira Gonçalves

Bruno Samuel Ferreira Gonçalves
At Algoritmi
Academic Degree
PhD
Current Position
Assistant Researcher at Escola de Engenharia da Universidade do Minho
Personal Webpage
Personal Email
bsg@dps.uminho.ptOrcid
0000-0002-7233-3192Researcher ID
FCT Public Key
J53659541Q12
Ciência ID
951C-19BB-2270Google Scholar
h-index
2Publications
13Editorial
0Citations
24Q1 / Q2
1Publications (11)
A two-level optimisation-simulation method for production planning and scheduling: the industrial case of a human–robot collaborative assembly line
International Journal of Production Research
2022 | journal-article
A systematized approach for reduction of medical appointment waiting list
Production
2022 | journal-article
Prioritizing Internal Production on MRI Waiting List Management: An Optimization Model
2022 | book-chapter
Reducing Waiting Time for Orthopaedic Consultation Through a Continuous Improvement Approach
2022 | book-chapter
Improving hospital operations management to reduce ineffective medical appointments
Cogent Engineering
2021 | journal-article
Data Modelling and Validation of An Emergency Department Simulation Model—A Lean Healthcare Approach
2021 | book-chapter
Implementation of lean in health care environments: an update of systematic reviews
International Journal of Lean Six Sigma
2020 | journal-article
Production Planning and Setup Time Optimization: An Industrial Case Study
2020 | book-chapter
Integrating Simulation and Optimization for Process Planning and Scheduling Problems
Computer Aided Chemical Engineering
2019 | book-chapter
Streamlining field inspections for infrastructures life-cycle management
Life-Cycle of Structural Systems: Design, Assessment, Maintenance and Management - Proceedings of the 4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014
2015 | conference-paper
Streamlining field inspections for infrastructures life-cycle management
Engineering for Progress, Nature and People
2014 | conference-paper
History
Init | End | Change | Value | |
---|---|---|---|---|
Laboratory | LPSL | |||
Member Type | Assistant Researcher | |||
17/01/2023 20:18 | ||||
Internal Member Type |
A two-level optimisation-simulation method for production planning and scheduling: the industrial case of a human–robot collaborative assembly line
International Journal of Production Research
2022 | journal-article
A systematized approach for reduction of medical appointment waiting list
Production
2022 | journal-article
Prioritizing Internal Production on MRI Waiting List Management: An Optimization Model
2022 | book-chapter
Reducing Waiting Time for Orthopaedic Consultation Through a Continuous Improvement Approach
2022 | book-chapter
Improving hospital operations management to reduce ineffective medical appointments
Cogent Engineering
2021 | journal-article
Data Modelling and Validation of An Emergency Department Simulation Model—A Lean Healthcare Approach
2021 | book-chapter
Implementation of lean in health care environments: an update of systematic reviews
International Journal of Lean Six Sigma
2020 | journal-article
Production Planning and Setup Time Optimization: An Industrial Case Study
2020 | book-chapter
Integrating Simulation and Optimization for Process Planning and Scheduling Problems
Computer Aided Chemical Engineering
2019 | book-chapter
Streamlining field inspections for infrastructures life-cycle management
Life-Cycle of Structural Systems: Design, Assessment, Maintenance and Management - Proceedings of the 4th International Symposium on Life-Cycle Civil Engineering, IALCCE 2014
2015 | conference-paper
Streamlining field inspections for infrastructures life-cycle management
Engineering for Progress, Nature and People
2014 | conference-paper
Start | End | Term | Value | |
---|---|---|---|---|
Laboratory | LPSL | |||
Member Type | Assistant Researcher | |||
17/01/2023 20:18 | ||||
Internal Member Type |